Landscaping & Outdoor Development

Specialized Contracting & Engineering

Soft Landscaping • Irrigation • Lighting • Hardscape

01Introduction 02Our Services 03Design Works 04Process 05Scope of Work 06Gallery

INTRODUCTION

Landscaping Overview

OUR SERVICES

Our Services

SAMPLE DESIGN WORKS

Sample Design Works
Integrated Design – Sustainable Living – Single-Source Execution

PROCESS SHOWCASE

ARCHITECTURAL DESIGN - SCOPE

Stage 1: Conceptual Design
  • Site analysis and evaluation.
  • Conceptual Drawings and visuals for specific areas.
Stage 2: Design Development
  • Provide developed and detailed landscape master plan based on the approval of client.
  • Explanatory visuals (sections and/or elevations and/or perspectives).
  • Schematic Planting Plan & Material Layout.
  • Coordinate Schematic Designs with other Trades.
Stage 3: Detailed Design
  • Update Schematic Design Drawings based on Review.
  • Prepare hardscape architecture details.
  • Prepare Final Planting Plan and Details.
  • Prepare Lighting Layout.
Stage 4: Construction Documents
  • Enlargement Plan, Site details and sections.
  • Hardscape Plan and Details.
  • Planting Plan and Details.
  • Lighting Plan and specification.
  • Irrigation Sleeves plan and Layout.
  • Landscape Specifications (Hard, Soft, Irrigation).
  • Submit Tender Documents to Client.
Stage 5: Construction Supervision
  • Office Support & Meetings.
  • Onsite Changes.
  • Visits to Suppliers.
  • Supervision Reports.
Stage 6: Maintenance
  • Weed all agricultural plants and pots.
  • Pruning of trees and shrubs; removal of cancers.
  • Fix climbers properly.
  • Using appropriate fertilizers, pesticides and insecticides.
  • Follow-up irrigation works with maintenance employee.
  • Train present Labor in the site.
  • Monthly Reports.
Stage 7: Maintenance Supervision
  • Train present Labor in the site.
  • Follow up on health status of plants.
  • Follow-up on weeding works and pruning.
  • Follow-up on growth of climbers.
  • Follow-up on fertilizers/pesticides & irrigation efficiency.
  • Monthly Reports.
EXCLUSIONS:
  • All structural, MEP, engineering and building architectural services.
  • Site investigation and survey (geotechnical/topographical/as-built).
  • All necessary approvals from governmental agencies and municipalities.
  • Stages 5, 6, 7 (separate fee contract).
×
Gallery Image
7.0s